At the site: "Residential house on Bakovka" occurs:
 
1. Reinforcement of the floor slab of the 16th floor of section 1-1;
2. Installation of the formwork of the slab of section 1-2;
3. Reinforcement and concreting of walls and columns of section 1-3.
4. Laying of external networks (storm sewerage, heat network from TK-1 to our house)
5. Masonry works of external walls of section 1-3, on the 7th and 8th floors.